I-205 Mainline
- Lanes on I-205 will close at night.
- Paving work will progress in segments.
- Auxiliary lane construction will take place on the freeway shoulder.
-
Weekend full closure of I-205 northbound from Foster Road to the I-84 Interchange, all lanes on I-205 northbound will close from 10 p.m. on Friday, August 2 to 5 a.m. on Monday, August 5.
Freeway ramps and connectors
-
Glisan St. on-ramp to I-205 southbound; full closure for an estimated 14 days.
-
Division St. on-ramp to northbound I-205; full 24/7 closure for 60 days from mid-March to mid-May.
These I-205 ramps will close at night (most ramps will open during the day; some lane restrictions may occur):
- All Glisan St. on-ramps and off-ramps; closed at night.
- All Stark St./Washington St. on-ramps and off-ramps; closed at night.
- All Division St. on-ramps and off-ramps; closed at night.
- Connecting road from Glisan St. to Stark St.; closed at night.
- Connecting road from Stark St. to Washington St.; closed at night.
- Southbound I-205 off-ramp to Glisan St.; closed an estimated 30 nights (intermittent closures).
- Ramp paving work will progress in segments.
Local roads
- Lane closures on:
-
Glisan St. at I-205 intersections.
-
Stark St. I-205 overpass and Washington St. I-205 overpass.
- Exit restricted to one-lane on Southbound I-205 exit to Division St.
ADA Improvements:
-
Glisan St. at I-205 intersection, sidewalk ramp upgrades and lowering crosswalk button heights to meet ADA standards.
-
Stark St. I-205 overpass, sidewalk ramp upgrades and lowering crosswalk button heights to meet ADA standards.
-
Washington St. I-205 overpass, sidewalk ramp upgrades and lowering crosswalk button heights to meet ADA standards.
Multi-use path
The I-205 multi-use path (Pacific St. to Glisan St.) 28 days full closure.