I-205 Mainline
- Lanes on I-205 will close at night.
- Paving work will progress in segments.
- Shoulder closure on I-205 northbound between I-84 eastbound and Killingsworth Street.
- Auxiliary lane construction will take place on the freeway shoulder.
-
Multiday, nighttime full closure of the I-205 Glenn Jackson Bridge in both directions for sign bridge installation from Sundays to Thursdays midnight to 5 a.m. Travelers will not be able to travel between Portland, OR and Vancouver, WA at this location during the closure.
Freeway ramps
- Northbound I-205 off-ramp to Killingsworth St.; full closure for an estimated 14 consecutive days and nights.
These I-205 ramps will close at night (all ramps will open during the day; some lane restrictions may occur):
-
Airport Way southbound on-ramp and northbound off-ramp; closed at night.
- All Killingsworth St. on-ramps and off-ramps; closed at night.
-
Exit 23B to U.S. 30 Bypass and Killingsworth Street detour:
- The primary detour will be exit 23A (Sandy Blvd), turn left on Killingsworth.
- The second will be exit 24A (Airport Way) to southbound on 82nd Way.
-
Sandy Blvd. on-ramps and off-ramps; closed at night.
- I-205 northbound off-ramp to Sandy Blvd.; shoulder closures.
- Ramp paving work will progress in segments.